Recent News

Application for Variance: Cell 6 Conveyance System Improvements at the Quarantine Road Landfill

Application for Variance: Cell 6 Conveyance System Improvements at the Quarantine Road Landfill

Alley Sweeping Comes to Baltimore Neighborhoods

August 11, 2014 (BALTIMORE, MD) — Alleys in selected Baltimore neighborhoods will soon get weekly mechanical sweeping.

Application for Qualitative Control Waiver: Washwater Lake Dam Stream Stabilization

Application for Qualitative Control Waiver: Washwater Lake Dam Stream Stabilization

BaltiMeter Rollout Begins in September

August 5, 2014 (Baltimore, MD) - Baltimore Mayor Stephanie Rawlings-Blake and Department of Public Works (DPW) Director Rudolph S.

Application for Quantitative and Qualitative Control Waiver: BGE 5911 Pennington Ave

Application for Quantitative and Qualitative Control Waiver: BGE 5911 Pennington Ave

City DPW Reports Sanitary Sewer Overflow Stopped

BALTIMORE, MD (July 30, 2014) – The Baltimore City Department of Public Works (DPW) announced that a sanitary sewer overflow, originating in the 2100 b

DPW to Start Proactive Sewer Lateral Program

July 29, 2014 (BALTIMORE, MD) — As part of a concerted effort to reduce sewer backups, Baltimore City Department of Public Works (DPW) Director Rudolph

Application for Qualitative Control Waiver: BGE PIPELINE PROGRAM

Application for Qualitative Control Waiver: BGE PIPELINE PROGRAM

Application for Qualitative Control Waiver: CSX Marley Neck Track #2

Application for Qualitative Control Waiver: CSX Marley Neck Track #2

Liberty Reservoir Day 2014

BALTIMORE. MD (July 24, 2014) – Please join Mayor Stephanie-Rawlings Blake and Baltimore City Department of Public Works Director Rudolph S.

Pages