Preparing Your Building for Reopening

Green banner with DPW logo and text "Department of Public Works Press Release"

Baltimore City Department of Public Works (DPW) Acting Director Matthew W. Garbark reminds owners of vacated or closed businesses and/or large buildings to check their water systems in preparation for "reopening." 

Note: Using water from our mains is the freshest, cleanest water for flushing building lines, without adding chemicals which could be harmful.

Most solutions for this are relatively simple for smaller structures, but as property managers of larger buildings are aware, there are a number of steps that must be taken to ensure proper flushing of water lines and cleaning of fixtures.

What happens in a building when the water system is not used for longer than usual periods of time?

  • The building’s water system begins at the meter where water enters the building and includes all plumbing, storage and fixtures to each tap.
  • When the water is not used, the disinfectant in the water dissipates. Without the disinfectant, microorganisms grow on pipes, fixtures and in tanks.
  • The protective scale on pipes can destabilize. Without the protective scale, toxic metals can dissolve or shear off as particles and end up in the water. 
  • Potentially harmful substances, such as disinfection byproducts (DBPs) can build up.
  • Mechanical equipment such as cooling towers, boilers and pumps should undergo routine maintenance.
  • Backflow preventers should be tested annually.

The scientists and engineers at the Environmental Science, Policy & Research Institute (ESPRI) and AH Environmental Consultants, Inc. (AH) have developed brief guidance material to help those who are responsible for maintaining large buildings’ water systems. Click here to read that material.

For residential customers, and those businesses that have continued to operate with regular water usage, you can be assured that your water supply is safe and plentiful.   

Related Stories

Mayor Scott, Acting DPW Director Zaied Announce DC-Based Firm to Conduct Independent Review of DPW’s Safety Practices

Mayor Brandon M. Scott and Khalil Zaied, Acting Director of the Department of Public Works, have announced that the City of Baltimore has hired Conn Maciel Carey LLP, a Washington, D.C.-based law firm specializing in workplace safety, to conduct a thorough review of DPW’s safety policies, practices, and procedures, specifically as they pertain to heat safety. The firm began work this week, with a final set of recommendations expected by the end of September.  

TODAY, Friday Aug. 9: DPW Cancels ALL Solid Waste Services---Recycling, Trash, Street Sweeping, Landfill Operations Suspended and Drop-off Centers Closed

Due to the extended tornado watch issued for the Baltimore area by the National Weather Service, the Baltimore City Department of Public Works (DPW) is cancelling ALL Solid Waste services today, Friday, August 9. In addition to the suspension of trash and recycling collections and mechanical street sweeping services, DPW is suspending operations at the Quarantine Road Landfill and at the Northwest Transfer Station and closing all Residential Drop-Off Centers.

DPW Suspends Trash, Recycling & Street Sweeping on Friday, August 9 Trash, Recycling Make-Up Day is Monday, Aug. 12

Due to weather advisories issued by the National Weather Service, the Baltimore City Department of Public Works (DPW) is cancelling all trash and recycling collections and mechanical street sweeping services on Friday, August 9, 2024. The trash and recycling make-up day will be Monday, August 12.