Last of September’s Sanitary Sewer Overflow Totals Reported

Green banner with DPW logo and text "Department of Public Works Press Release"

Final sewer overflow totals are in following rains in the Baltimore area late last week, on Sept. 27 and 28.  These rains resulted in approximately 14.6 million gallons of stormwater mixed with sewer water flowing into the Jones Falls.  This volume was released through structured overflows. 

To reiterate, structured overflows were designed as part of Baltimore’s sewer system more than 100 years ago. They alleviate excess volume in the wastewater system when storm water infiltrates into the sewer mains. The structures automatically divert excess water directly into streams in order to prevent it from surfacing on streets or in basements. DPW is in the process of improving its sewer system and eliminating these structures as part of the $2 billion Sanitary Sewer Consent Decree. 

The Baltimore City Health Department and the Maryland Department of the Environment were notified of the sewage releases. The public is reminded to avoid contact with urban waterways due to the risk of pollution. For information about health concerns as a result of sewer overflows please go to http://health.baltimorecity.gov/sanitary-sewer-overflows-sso.

As a reminder, citizens who experience basement sewage backups as a result of rain events are encouraged to take advantage of the city’s Expedited Reimbursement Program (ERP).  This program is to reimburse residents and property owners for cleanup costs related to sewage backups caused by wet weather.  Application and eligibility information can be found at https://publicworks.baltimorecity.gov/sewer-consent-decree/building-backups. Please note that this program is NOT designed for costs related to flood damage, hurricanes, or other extreme weather events.

Related Stories

DPW is Now Accepting Public Comments on the Modified Sanitary Sewer Consent Decree Revised Emergency Response Plan 

The Baltimore City Department of Public Works (DPW)  has announced the release of its Revised Emergency Response Plan (ERP), a reference tool to be used by City personnel during a sanitary sewer overflow or reported building backup emergency. The Modified Sanitary Sewer Consent Decree (MCD) requires DPW to submit a revised Emergency Response Plan to protect the public health and welfare in the event of an unpermitted release, spill, or discharge of pollutants from the sewer collection system or in the event of a reported building backup.

Register Now for the Mayor's Fall Cleanup, October 26

Mayor Brandon M. Scott, the Baltimore City Department of Public Works (DPW), and the Mayor's Office of Community Affairs have announced the upcoming Mayor's Annual Fall Clean-up and Day of Service. Residents, volunteer groups, and community associations are encouraged to register now to participate in the city-wide effort to beautify neighborhoods. The event will run on Saturday, October 26, 2024, from 9 a.m. to 1:00 p.m.

Mattress and Box Spring Recycling Now Available at Quarantine Road Landfill Residential Drop-Off Center



Looking to get rid of an old mattress? Baltimore City residents can now drop off mattresses and box springs for recycling at the Baltimore City Department of Public Works’ (DPW) Quarantine Road Landfill Residential Drop-Off Center. In the coming months, DPW will expand this mattress recycling service to other Residential Drop-Off Centers across the city.