Application for Qualitative Control Waiver

Canton Phase 2
Canton
Baltimore City, Maryland

The City of Baltimore Department of Public Works is accepting public review and comments on this project’s application for a qualitative control waiver.

Applicant: Baltimore Gas & Electric
ESD #: 7417
Watershed(s): Baltimore Harbor

Project Description: Canton Phase 2 is selected to be included in the replacement program due to the historical maintenance records, high optimain risk scores, and the concern on low gas pressures and capacity issues.  The project has an approximate area of 0.34 acres and is located within the area bounded by Dillon Street (to the North), Boston Street (to the South), South Linwood Avenue (to the East), and South Lakewood Avenue (to the West). The project will consist of installation of new gas main and abandonment of existing main via open trenching.

The Applicant is requesting a qualitative control waiver in accordance with Article 7, Division II, §23-2 of the City Code.  The Applicant has demonstrated that the 0.34 ac of the project will return the disturbed area to a predevelopment runoff condition. The applicant will not be required to provide qualitative control controls for this 0.34 ac project. 

To obtain information about this waiver request, please contact Rosanna La Plante, Baltimore City Department of Public Works, Bureau of Water and Wastewater, Office of Compliance and Laboratories, Room 228, 3001 Druid Park Drive, Baltimore, MD 21215, (410-396-0732) or by e-mail to DPW.Plansreview@baltimorecity.gov. To obtain specific information concerning the above referenced project, contact Baltimore Gas & Electric, Lineta Duren (443-780-1747).

Send information or comments about this waiver request to Rosanna La Plante, Baltimore City Department of Public Works, Bureau of Water and Wastewater, Office of Compliance and Laboratories, Room 228, 3001 Druid Park Drive, Baltimore, MD  21215, (410-396-0732) or by e-mail to DPW.Plansreview@baltimorecity.gov by 4:30 PM, November 17, 2017.  Comments received after 4:30 PM, November 17, 2017, will not be considered.

Any further notices about actions on this application will be posted on the Department’s website.

 

Related Stories

B&P Tunnel Replacement Program Intermediate Ventilation Facility (IVF)

PUBLIC NOTICE

B&P Tunnel Replacement Program Intermediate Venti

Frederick Douglass Tunnel Program B&P Tunnel Replacement Project

PUBLIC NOTICE

Frederick Douglass Tunnel Program B&P Tunnel Repl

NEW SUGAR STORAGE

PUBLIC NOTICE

NEW SUGAR STORAGE