Application for Redevelopment Development Waiver: EAST BALTIMORE DEVELOPMENT INC.

Application for Redevelopment Development Waiver: EAST BALTIMORE DEVELOPMENT INC.

The City of Baltimore Department of Public Works is accepting public review and comments on this project’s application for a redevelopment waiver. If granted, the project need not comply with the requirements of the State’s Design Manual for quantity control.

Applicant:

East Baltimore Development Inc., 1731 East Chase Street, Baltimore, MD 21213

ESD #:

717

Watershed:

Baltimore Harbor (Patapsco River)

Project Description:

The project has an approximate area of 1.6 acres and is approximately two city blocks along E. Eager Street bounded by N. Washington Street to the west and N. Chester Street to the east.. The project calls for removal of all building structures within the project area. The remaining hard surfaces such as sidewalks and alleys will be removed in the future under a separate phase.

The Applicant is requesting a redevelopment waiver in accordance with Article 7, §23-7 of the City Code. The existing impervious area coverage meets the conditions for this waiver. The project will provide impervious area reduction to satisfy the requirements of this waiver for 0.59 ac of this project

To obtain information about this application, please contact Baltimore City Department of Public Works, Bureau of Water and Wastewater, Surface Water Management Division, 3001 Druid Park Drive, Baltimore, MD 21215, (410-396-0732) or by e-mail to swm@baltimorecity.gov.

Send information or comments about this application to Baltimore City Department of Public Works, Bureau of Water and Wastewater, Surface Water Management Division, 3001 Druid Park Drive, Baltimore, MD 21215, (410-396-0732) or by e-mail to swm@baltimorecity.gov by 4:30 PM September 25, 2013 Comments received after 4:30 PM September 25, 2013 will not be considered.

Any further notices about actions on this application will be posted on the Department’s website.

Related Stories

B&P Tunnel Replacement Program Intermediate Ventilation Facility (IVF)

PUBLIC NOTICE

B&P Tunnel Replacement Program Intermediate Venti

Frederick Douglass Tunnel Program B&P Tunnel Replacement Project

PUBLIC NOTICE

Frederick Douglass Tunnel Program B&P Tunnel Repl

NEW SUGAR STORAGE

PUBLIC NOTICE

NEW SUGAR STORAGE