Lake Montebello Water Level Lowered to Facilitate Montebello Plant I Upgrades

Green banner with DPW logo and text "Department of Public Works Press Release"

Montebello Water Filtration Plant I is undergoing upgrades.  These improvements will enhance quality control within the Plant and help the Department of Public Works (DPW) continue to meet federal and State regulations required for safe drinking water.

This work requires that Plant I be dewatered. To maintain good water quality requirements for our NPDES (National Pollutant Discharge Elimination System) permit, the water level of Montebello Lake is being lowered to allow it to handle the addition of 55+ million gallons of pretreated water from Plant I.  The water will be allowed to settle in the Lake, before being discharged to Tiffany Run/Herring Run. 

These plant operational changes will temporarily alter the normal aesthetics of the Lake. There will be more exposed rocks, branches, and debris as the water level is lowered and pockets of sludge are exposed. There will also be a more profound earthy or stale odor of the water at the east end of the Lake. These changes may be observed over the next two weeks, as the plant performs its dewatering operations.  

Following the dewatering, a 30 day shutdown of the plant is expected to begin in late October.  Plant upgrades will be complete in November 2022.

 

It is important to note that Montebello Lake is not a drinking water source. It is a settling basin for water discharged from filtration processes at the Montebello Filtration Plants.

Related Stories

DPW is Now Accepting Public Comments on the Modified Sanitary Sewer Consent Decree Revised Emergency Response Plan 

The Baltimore City Department of Public Works (DPW)  has announced the release of its Revised Emergency Response Plan (ERP), a reference tool to be used by City personnel during a sanitary sewer overflow or reported building backup emergency. The Modified Sanitary Sewer Consent Decree (MCD) requires DPW to submit a revised Emergency Response Plan to protect the public health and welfare in the event of an unpermitted release, spill, or discharge of pollutants from the sewer collection system or in the event of a reported building backup.

Register Now for the Mayor's Fall Cleanup, October 26

Mayor Brandon M. Scott, the Baltimore City Department of Public Works (DPW), and the Mayor's Office of Community Affairs have announced the upcoming Mayor's Annual Fall Clean-up and Day of Service. Residents, volunteer groups, and community associations are encouraged to register now to participate in the city-wide effort to beautify neighborhoods. The event will run on Saturday, October 26, 2024, from 9 a.m. to 1:00 p.m.

Mattress and Box Spring Recycling Now Available at Quarantine Road Landfill Residential Drop-Off Center



Looking to get rid of an old mattress? Baltimore City residents can now drop off mattresses and box springs for recycling at the Baltimore City Department of Public Works’ (DPW) Quarantine Road Landfill Residential Drop-Off Center. In the coming months, DPW will expand this mattress recycling service to other Residential Drop-Off Centers across the city.