Sewer Overflow Stopped

Press Release

A clogged sewer line led to an overflow of more than 10,000 gallons from a manhole in the rear of the 6300 block of Park Heights Avenue in Baltimore. The overflow was abated today, Thursday, February 9, 2017, when crews from the Baltimore City Department of Public Works (DPW) were able to clear the blockage and clean the location. Closed circuit TV inspections of the line are being conducted.

Because the sewer overflowed onto a large field, it did not directly enter any storm drains or streams. The start time of this overflow is unknown because it was in an isolated area, and could have gone unseen for several days.

The Maryland Department of the Environment and the Baltimore City Health Department have been notified. Baltimore City is in the construction phase of the over $1 billion Consent Decree rehabilitation of our sewer infrastructure.

DPW reminds everyone that fats, oils and grease (FOG) contribute to sewer overflows and backups throughout the City. In addition, "flushable" wipes are not flushable at all and also contribute to sewer backups. They do not dissolve like toilet tissue. If something doesn't belong in the drain, please keep it out of the drain.

For more information about health concerns as a result of sewer overflows please go to: http://health.baltimorecity.gov/sanitary-sewer-overflows-sso.

Related Stories

Harford Road Closed at Herring Run Bridge 20 Inch Water Main Break

The Harford Road Bridge over Herring Run has been temporarily closed to traffic  between Argonne Drive and Chesterfield Avenue. This is due to a water main break that has occurred under the deck of the bridge.  Harford Road is closed in both northbound and southbound directions.

Earth Day, Saturday April 22, 2017 FREE Shred Day!

Cleaning out your filing cabinet? Bring your sensitive documents to the Baltimore City Department of Public Works free shredding event on Saturday, April 22, from 9:00 a.m. to 1:00 p.m. at Edmondson Westside High school, 501 N. Athol Avenue, 21229

 

Don't Miss Out - Sign Up by April 24 for Mayor Catherine E. Pugh’s Spring Cleanup

Now is your opportunity to join the 235 communities that have already signed up for Mayor Catherine E. Pugh’s Spring Cleanup. This year’s event will be held on Saturday, April 29, from 9 a.m. to 1 p.m. 

Contact

Jeffrey Raymond
410-545-6541
[email protected]
Kurt Kocher
410-545-6541
[email protected]
Jennifer Combs
410-545-6541
[email protected]
After hours, weekends, or holidays please call 410-396-3100 for the duty officer

The Baltimore City Department of Public Works supports the health, environment, and economy of our City and region by cleaning our neighborhoods and waterways and providing its customers with safe drinking water and sustainable energy practices.