Emergency Work Completed on 10-Foot Storm Drain

Green banner with DPW logo and text "Department of Public Works Press Release"

BALTIMORE, MD - Baltimore City Department of Public Works Director Rudolph S. Chow, P.E., today announced that emergency work has been completed on a 10-foot diameter storm drain culvert at Washington and Eager Streets. Paving is completed, and the streets are now reopened to traffic.

A deterioration problem was first noted through a routine, proactive inspection in December 2014. This situation was monitored and further visually inspected for changes, leading to a decision to close of the intersection to traffic in late winter rather than risk a potentially catastrophic collapse. An emergency contract was awarded to the infrastructure company Spiniello for emergency repairs.

Director Chow stated: “Because of the proactive inspections conducted by the Department of Public Works, we avoided a potential street collapse. It is our job to make sure that our underground infrastructure is constantly monitored and restored as warranted.”  

The work included:

Storm Drain: 

  • Creating an access entry
  • Bypass draining
  • Installing 270 linear feet of 120” CIPP (cured in place pipe) lining
  • Grouting of voids
  • Restoring the brick culvert and backfilling.

While the intersection was closed and excavated, additional utility improvements were done, including:
 
Sanitary Sewer:
 

  • Sewer bypass pumping
  • Installing 525 linear feet of 15” CIPP lining in sewer main
  • Installing 560 linear feet of 8” CIPP lining in sewer main
  • Installing 70 linear feet of 10” CIPP lining in sewer main
  • Making five sanitary sewer open cut point repairs
  • Replacing 22 linear feet of 10” sewer main
  • Backfilling and site restoration

Water:
 

  • Repairing a joint leak on a 40” water main
  • Repairing a water service line leak
  • Replacing a leaking fire hydrant
  • Backfilling and site restoration.

The total cost for this work, including paving, was $2.6 million.

Related Stories

DPW Offices and Facilities Close for Good Friday, March 29 Trash, Recycling Pickups to Resume Saturday, March 30

Baltimore City Department of Public Works (DPW) Acting Director Khalil Zaied reminds residents that Good Friday, March 29, 2024, is a City holiday and DPW offices and sanitation yards will be CLOSEDThere will be NO trash or recycling collections on Good Friday. Trash and recycling collections, normally scheduled for Friday, March 29, will be collected on the make-up day, Saturday, March 30.

Mayor Scott to Nominate Khalil Zaied as New Director of the Department of Public Works

Mayor Brandon M. Scott has announced his intent to nominate Khalil Zaied as the new Director of the Department of Public Works (DPW). Zaied, who most recently led the Department of Public Works in Champaign, Illinois, will join DPW on March 18, 2024. Previously, he was a nearly 20 year veteran of Baltimore City Government, serving as Deputy Mayor of Operations and Director of Transportation, among other roles.

Mayor Scott, City Agencies Highlight the Return of Weekly Recycling

On Monday, March 4, Mayor Brandon M. Scott, Department of Public Works Interim Director Richard J. Luna, Department of General Services Director Berke Attila, and Baltimore City Chief Administrative Officer Faith Leach joined city staff and community members to highlight the return of weekly, curbside recycling collections for Baltimore City residents, starting Tuesday, March 5.